Free tool for contractors
You know what you're charging. Do you know why?
Find out what your crew needs to bill per hour to cover your costs and hit your profit goal. Free, no signup, built by a contractor for contractors.
Your numbers
Example numbers. Put in yours.About a minute. Five numbers, then your truck, equipment and drive costs or the examples.
Everyone on site together, you included if you work and pay yourself.
The average wage, before payroll taxes.
Insurance, phones, software, shop, office, your truck payments if you count them here. Crew pay left out.
A share of the price. 20% on a $100 bill is $20 kept after every cost.
Billable time on site in a typical day. Drive and shop time left out.
Truck, equipment and drive
These depend on how you run, so they are examples, not your costs. Use them to start, or put in yours.
- Truck and trailer
- $120 a work day, fuel includedExample
- Handheld equipment
- $25 a work dayExample
- Drive
- 45 min a dayExample
Optional. Per worker, not per crew: $150 an hour for a crew of 3 is $50 per worker-hour.
Your hourly rate
EstimateEstimate with example costs. It uses examples for the truck and trailer, handheld equipment and drive time, not your costs. Use them or put in yours under Truck, equipment and drive.
Break-even
$42.42per worker-hour
What one worker-hour on site costs you: pay with payroll costs, overhead, drive time and equipment. Charge less and every hour loses money.
Target for 20% profit
$54per worker-hour
Break-even plus the profit you want, rounded up to the whole dollar (21.5% margin). Quote from this.
For your crew of 3, per crew-hour
$127.25 break-even, $162 target. That is 3 workers on site for one hour, the per worker-hour rate x 3.
Type what you charge now, per worker-hour, and see what it really leaves you.
Worked out from your numbers with the same math the Garten CRM prices cleanups with. An estimate to check your pricing against, not a promise of profit.
Where every dollar of $54 goes
One worker-hour on site, at your target rate. The rows add up to the rate exactly.
| Crew pay (wage) | $20 |
|---|---|
| Payroll taxes, workers comp and benefits | $6 |
| Overhead | $7.94 |
| Travel (the crew's drive time) | $2.44 |
| Equipment | $6.04 |
| Profit | $11.58 |
| Your target, per worker-hour | $54 |
Every assumption used
- Payroll costs
- 30% on top of wagesStarting estimate
- Billable work days a month
- 21. Days the crew bills; rain days, shop days and holidays left outStarting estimate
- Billable worker-hours a month
- 504 (3 workers x 8 hrs on properties x 21 work days)Worked out
- Overhead
- $4,000 a month, spread over those billable hoursYours
- Drive
- 45 minutes a day. The crew is paid for it, but it is not billed timeExample
- Truck and trailer
- $120 a work day, fuel includedExample
- Handheld equipment
- $25 a work day (blower, trimmer, edger)Example
- Fuel
- Inside the truck's day cost, so miles add nothing on topWorked out
- Rounding
- The target is rounded up to the whole dollar, never downWorked out
The link holds your numbers only. No name, no business, nothing else.
Want this rate under every quote?
The Garten CRM prices your cleanups with this same math and shows what you keep on every quote before you send it. Built by a contractor who ran crews for 12 years.
15 minutes with Ty, the owner. No contract.